Klausen Trading Company Pty Ltd

Muller - Dust-free handling of powders

Back

Standard version

 

 

  • Simple docking
  • Accurate positioning not necessary
  • Key to sketch:
  • A - product
  • B - into machine
  • C - silicone elastomer cap
  • D - system inlet tube / cone
  • E - lip seal

     

    Version with hopper pressed against lip seal

  • Simple docking if system becomes slightly pressurized
  • Key to sketch:
  • A - product
  • B - into machine
  • C - silicone elastomer cap
  • D - system inlet tube / cone
  • E - lip seal pressed down

     

    Telescopic version

    • Simple docking with telescopic intermediate tube
    • Key to sketch:
    • A - product
    • B - into machine
    • C - silicone elastomer cap
    • D - system inlet tube / cone
    • E - lip seal
    • F - telescopic intermediate tube 

     

    Charging a reactor

  • Key to sketch:
  • A - drum
  • B - hopper
  • C - inlet elbow
  • D - lift / swivel / invert column
  • E - lip seal pressed down

     

    Feeding a tablet press

    • Key to sketch:
    • A - drum
    • B - hopper
    • C - nest
    • D - supporting column
    • E - lip seal
    • F - tablet press
    • G - mobile lifting and inverting unit
    • H - variant with dust extraction connection

     

    Charging / discharging a twin-shell tumbler

  • Key to sketch
  • A - drum
  • B - hopper
  • C - inlet elbow
  • D - lift / swivel / invert column
  • E - lip seal
  • F - twin-shell tumbler
  • G - drum truck
  • H - centering guide
  • J - Type MC butterfly valve
  • K - drum lid with filling opening:
    • K1 - Filling drum:
      lid placed over drum
    • K2 - Removing drum:
      lid retracted on discharge nozzle

     

    Charging / discharging a mill

  • Key to sketch
  • A - drum
  • B - hopper
  • C - nest
  • D - supporting column
  • E - telescopic intermediate tube
  • F - mill
  • G - drum truck
  • H - drum lid with filling opening:
    • H1 - Filling drum:
      lid placed over drum
    • H2 - Removing drum:
      lid retracted on discharge nozzle
  • J - Nest swivels aside

     

    Charging through a floor

     

  • Key to sketch
  • A - hopper bin
  • B - carriage
  • C - Type MC butterfly valve
  • D - distribution manifold
  • E - Charging sequence:
    • Step 1
      Move hopper bin over charging opening
    • Step 2
      Docking with telescopic intermediate tube
    • Step 3
      Telescopic intermediate tube retracted
    • Step 4
      Opening covered